Concrete is flowing at Gabriel Park. About 50% of the snake is poured and it looks like it’s going to be a blast. It’s getting hot out there, so if you think about it, liquid donations are always appreciated by the work crew. Keep skatepark builders hydrated. Check out more of the progress pics after the turn.
Click on an image for a larger view.
Nine bowl looking up snake
Two bowl to nine bowl
Nine to two bowl
Two bowl marker
Nine bowl marker
Melissa working on a wall
Snail tail or slug, you pick
Crew working the top of the snake
View from the hill
Looks like it could be an early summer/late spring opening
Is there a date for a grand opening?
Wahoo!
What’s that rockmaster sticker from?
That rock master sticker was on the shot-crete machine. Good inspiration for the guest Cold War design huh?
Snail tail or slug? I’m going with side pipe.
Thanks.
Thanks for the updates, Rich. Keep em coming.